01 · Köln · BIM-Management
Key facts
Site
Cologne
Type
School
Role
Design, BAP, EIR (work stages 2–5)
Client / partner
City of Cologne (client) · RKW Architektur + (as employee)
Year
since 2022
Status
Ongoing
Project
School building for the City of Cologne in Deutz, built using the Goldbeck system. As an employee of RKW Architektur + in work stages 2 to 5: design drawings and facade sections, BIM execution plan (BAP) and use cases according to the EIR (AIA).
Contact
A plot or an existing building, the brief and your timeframe: that’s all we need to get started. You’ll get an assessment and a proposal for how we’d approach it. Even if, in the end, we turn out not to be the right fit.
info@oaa-studio.siteOAA STUDIO · Im Beckmannsfeld 19 · 45307 Essen