Services 02 · BIM Consulting

BIM isn’t software. It’s an agreement.

Models rarely fail because of the technology. They fail because nobody put in writing who delivers what information, when, and in what format. That’s where we come in, speaking the language of your tender documents, not a software vendor’s.

We come from design practice ourselves, and we’ve delivered everything we specify. So we never write a requirement nobody can meet on a live project.

Option A

Within our own projects

When we design the building, we work in the model. The BIM services included depend on the project’s scope and are set out clearly in our quote.

Option B

As standalone consulting

For the public sector, investors and architecture practices, with no architecture commission involved. We advise, check and coordinate, but don’t design.

01 · Roles

Three roles. Kept apart.

On any one project we take on one role, not all of them at once. That keeps it clear who checks and who delivers.

Client side

BIM management

We act on your side: setting goals, writing the EIR, accepting deliveries. You stay in control of the information without having to open a model yourself.

Design team side

Lead BIM coordination

We federate the discipline models, keep the BEP up to date and chair the coordination meetings. Clashes get resolved in the model, not on site.

For your practice

BIM consulting

We help your practice get started or take the next step: standards, templates, training. Vendor-neutral, and only as far as you need.

02 · Services

Available as individual services or as ongoing support throughout the project.

01 Strategie

BIM strategy

What should the model deliver for the project? Goals, scope, roles and outputs are defined before anyone buys software.

02 AIA

Information requirements

What information is needed at which stage: attributes, areas, analyses. Requirements that can actually be verified.

03 BAP

BIM execution plan

Model structure, naming conventions, exchange formats and checking procedures. The document people actually use on a live project.

04 Qualität

Model checking

Structure, completeness and consistency of the models delivered. You get check reports and prioritised clash lists.

05 Koordination

Clash detection

Federating discipline models and tracking clashes as tasks with an owner and a deadline, not by email.

06 Setup

Revit setup and training

Templates, parameter logic and views for your team, plus support on live projects so the standards actually stick.

03 · Who it’s for

Different clients, different questions.

Public sector

The question

BIM is required, but what exactly goes into the tender?

What we do

EIRs and tender documents that can actually be checked, plus acceptance of deliveries throughout the project.

Investors and developers

The question

How reliable are quantities, areas and programme at an early stage?

What we do

Model-based area and quantity take-offs, and data you can keep using once the building is in operation.

Architecture and engineering practices

The question

The client wants BIM, but your team has little experience with it.

What we do

Templates, a BEP and support on your first project, until your team can run the process itself.

04 · Deliverables

What you actually get

Consulting is hard to judge when there’s nothing to show for it. So here’s what you’ll actually receive: documents ready to hand to a public client.

Vision and approach

What BIM means for this specific project, in a form decision-makers can follow.

EIR: Exchange Information Requirements

Written for the tender, with appendices for attributes and stages.

BEP: BIM execution plan

Covering model structure, naming, formats, deadlines and checking procedures.

Check reports

For each delivery, with findings, rating and open issues.

Coordination lists and BCF

Tracked through to resolution, with clear responsibilities.

Templates and attribute tables

A Revit template and parameter lists your team can put straight to use.

Tools and qualifications

Revit Solibri BIMcollab IFC / openBIM Dynamo BIM-Manager (VDI / buildingSMART)

05 · Case study · The Stack

Many parties. One shared version.

On The Stack, while at RKW Architektur +, I was lead BIM coordinator, responsible for making all the discipline models work together. It was built on clear rules for model structure, naming and delivery dates, agreed with everyone at the outset.

Every delivery was checked, and clashes were tracked as BCF issues with a location in the model, an owner and a deadline. They were resolved in regular coordination meetings rather than getting lost in email threads. That way, every engineer was always working from the same verified version.

06 · FAQ

Questions about BIM

Ab welcher Projektgröße lohnt sich BIM? +

It’s less about size than about who’s involved. Once several consultants work in parallel, or the client needs data for operation, a clear agreement pays for itself.

Was kostet eine AIA? +

That depends on the type of project, the work stages and the use cases you need. After an initial conversation you get a written quote with a clearly defined scope.

Arbeiten Sie herstellerneutral? +

Yes. We work in Revit ourselves, but we write requirements around IFC and openBIM. Your consultants can stick with the software they know.

Können Sie auch nur einzelne Leistungen übernehmen? +

Yes. A model check, a BEP or a training session can be commissioned on its own. Ongoing support is an option, not a condition.

Was brauchen Sie für eine erste Einschätzung? +

The type of project, who’s involved, the planned programme and, if you have them, any existing requirements or tender documents.

07 · Next step

Tendering a project with BIM requirements?

Send us the project type, the parties involved and the planned process. We’ll tell you which requirements are realistic and which just create extra work.