BIM explained

BIM in brief

The terms that come up in almost every tender and every coordination meeting. No jargon, straight from practice.

01 · Basics

What is BIM?

Building Information Modelling means the building is built digitally first, as a model made of elements that know what they are. A wall is no longer just a line on a drawing – it carries its material, build-up, fire rating and cost.

Drawings, quantities and schedules are all taken from that model. Change something, and it changes everywhere. What really matters, though, isn’t the software but the agreement: who delivers which information, when, and to what level of detail.

02 · Cost-effectiveness

When does BIM pay off?

It’s not the size of a project that decides, but the number of interfaces. When architecture, structure and building services work in parallel, most mistakes happen between the drawings. That’s exactly where a shared model helps.

For a single house with one designer, a tidy 3D model in-house is often enough. For schools, fire stations or housing schemes with several consultants, an agreed BIM approach almost always pays off – on site at the latest.

03 · Documents

EIR and BEP: what goes where?

The Exchange Information Requirements (EIR) set out what the client needs to know: which goals, which use cases, which data at which point. They form part of the tender and so become part of the contract.

The BIM Execution Plan (BEP) is the design team’s response. It sets out who is responsible for which model, how files are named, how often models are coordinated and how they’re checked. The EIR says what’s needed; the BEP says how it will be delivered.

04 · Exchange

openBIM and IFC

Every consultant works in their own software. To make the models fit together anyway, there’s the open exchange format IFC. openBIM means requirements and handovers are written around that neutral format, not for one particular program.

For clients there’s a practical upside: you’re not tied to any vendor, and the data will still be readable in twenty years, long after the building has gone into operation.

05 · Coordination

How does a model check work?

The discipline models are federated at regular intervals and checked automatically for clashes – a duct running through a downstand beam, say. On top of that come rule checks: are all rooms named, is the fire data right, are any mandatory attributes missing?

Each issue is logged as a BCF topic with a snapshot and an owner. The coordination meeting decides who changes what, and the next check shows whether it’s been done.

06 · Existing buildings

BIM for existing buildings

In conversion and refurbishment work, a reliable starting point is often missing. Old drawings rarely match the building. A laser-scan survey produces a point cloud from which the existing-conditions model is built.

How detailed the model needs to be depends on the job. For a change of use, walls, slabs and openings are enough; refurbishing the services needs more. We agree that level up front, so nothing gets surveyed that isn’t needed.